{"product_id":"340-litre-grp-water-tank-with-insulation-stock-tank","title":"340 Litre GRP Water Tank with Insulation Stock tank","description":"\u003ch2\u003e340 Litre GRP Water Tanks - Insulated (25mm) Full WRAS approval\u003c\/h2\u003e\n\n\u003cp\u003ePlease note this tank is a stocked item. If you require an encapsulated baseboard or Drip tray with the tank please click on the following link to PW340-1\u003c\/p\u003e\n\n\u003cp\u003eManufactured to meet BS7491 Parts 1 and 2, using the highest quality GRP materials, ensuring a long service life with minimal maintenance requirements. Grey colour as standard (other RAL or BS colours are available at additional cost). Only materials of the highest quality are used along with a highly efficient manufacturing process. This combination ensures that these tanks are of the highest quality available.\u003cbr\u003e\nAll internal surfaces, including the lid, have an Isophthalic white gelcoat layer which provides a clinically smooth surface which will not support the growth of microbiological organisms. This gelcoat layer is reinforced by the main GRP laminate which provides the main structure of the tank body. The materials used are of the highest quality and applied with exacting production standards to assist in the prevention of osmotic blistering. After the CFC-free PU foam insulation is fitted, the GRP outer skin is then applied. This ensures that the insulation is fully encapsulated and protected from external conditions. Where access is a limiting factor and our one-piece GRP tanks are unsuitable a two-piece tank could do the trick. These tanks are manufactured in two or more horizontally split sections which are then assembled once the restriction has passed. In a nutshell and a one-piece tank in two or more bolt-together sections. All of the components including sealant and fixings for the joint flange are supplied with the tank. The assembly of this range of products could not be easier and should not prove difficult for any competent mechanical services engineer.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNominal capacity shown\u003c\/strong\u003e\u003cbr\u003e\n\nNominal capacity = full capacity to the top of the tank\u003cbr\u003e\n\nActual capacity = float level\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease note: valves and fittings are supplied loose (items can be fitted to the tank for an additional fee).\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe tank is supplied as standard with two built-in fixing pads, positioned at opposite ends of the tank.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch3\u003eDelivery\u003c\/h3\u003e\n\n\u003cp\u003eAll our GRP tanks are for delivery by customer offload. This entails the customer acquiring the right manpower and\/or machinery to help unload the tank\/s from the delivery vehicle.\u003c\/p\u003e\n\n\u003cp\u003eIf you require assistance with offloading, we may be able to offer a tail lift (lowers the tank to the ground) or HIAB (lorry with a mounted crane to winch the tank off the delivery vehicle). Please contact us if this is required for delivery.\u003c\/p\u003e\n\n\u003ch3\u003eDoes your tank need a clean?\u003c\/h3\u003e\n\n\u003cp\u003eWater can pose a number of risks if not maintained correctly, with this in mind we can offer the below service for your GRP tanks.\u003c\/p\u003e\n\n\u003ch3\u003eAnnual Disinfection Information and Options\u003c\/h3\u003e\n\n\u003cul\u003e\n\n\t\u003cli\u003eDesigned for easy installation, saving time and money\u003c\/li\u003e\n\n\t\u003cli\u003eWe can offer monthly, yearly and fixed-priced packages ranging from 1-3 years\u003c\/li\u003e\n\n\t\u003cli\u003eAll work is carried out by CSCS-qualified engineers\u003c\/li\u003e\n\n\t\u003cli\u003eTank upgrade works available, bringing the old tanks up to current regulations\u003c\/li\u003e\n\n\t\u003cli\u003eFull tank replacement works are available\u003c\/li\u003e\n\n\t\u003cli\u003eLegionella risk assessments including schematic drawings if required\u003c\/li\u003e\n\n\t\u003cli\u003eMicrobiology analysis - water sampling via UKAS-approved laboratories\u003c\/li\u003e\n\n\t\u003cli\u003eBuilding flush and mains injection\u003c\/li\u003e\n\n\t\u003cli\u003eCommissioning of booster sets\u003c\/li\u003e\n\n\t\u003cli\u003eServicing of water softeners and booster sets\u003c\/li\u003e\n\n\t\u003cli\u003eReplacement of hollow roof struts.\u003c\/li\u003e\n\n\t\u003cli\u003eInsulating of existing cold water storage tanks\u003c\/li\u003e\n\n\u003c\/ul\u003e\n\n\u003cp\u003eFor more information regarding the annual disinfection, please click \u003ca href=\"https:\/\/www.tanks-direct.co.uk\/grp-commissioning\"\u003ehere\u003c\/a\u003e\u003c\/p\u003e","brand":"Purewater","offers":[{"title":"Default Title","offer_id":56703803326789,"sku":"PW340-1-ST","price":467.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0997\/4595\/6165\/files\/4482_7599.jpg?v=1767800613","url":"https:\/\/tanks-direct.co.uk\/products\/340-litre-grp-water-tank-with-insulation-stock-tank","provider":"Tanks Direct","version":"1.0","type":"link"}